A DynaPier dealer in San Antonio was called on to do an emergency lift and stabilization for the utility foundations on a San Antonio project. They lifted some of the foundation 5”. 135 piers were installed in a very tight working area within a very short time frame. This large project was completed on time due to the easy installation of DynaPier®.