The DynaPier system is different from other piering systems because it will achieve the greatest depth while installed in a position to provide the greatest support.
The patented DynaPier® is comprised of high-strength concrete that is pre-cast in a steel sleeve which provides superior shear strength and compressive resistance as proven by independent testing labs. The outer casing is filled with a concrete core, and cured for maximum strength. The DynaPier® segments are hydraulically driven into the ground one at a time. After one DynaPier® segment is driven, another segment is connected to the pier, and the process is repeated until the foundation pier hits bedrock or a dense strata of subsurface material. A temporary platform is attached to the pier so that the structure can be lifted. Once the desired lift is achieved the pier is extended up to the footing and the pier cap is attached to the pier.
- The pier is located centrally and directly beneath the foundation footing.
- ALL parts are connected to form a monolithic pier.
- ALL shims are contained within the pier cap.
- Installation does not require removal or breaking of the footing; footing remains completely intact.
The result is a foundation that far exceeds the home’s original structural integrity, making the foundation better than new.


